One platform.
Every stage of the loss.
A unified estimating partnership for mitigation, reconstruction and upcoming exterior. Contractor-friendly pricing, professional geometry verification and one integrated delivery experience.
01 / Interactive estimating economics
Estimating revenue split only; capture and operating costs are excluded. The 30% figure is not a fully loaded gross margin.
02 / Published-price concept
Six fixed tiers, then an automatic 0.15% of RCV above $500K. No case-by-case quotation step.
| Scope RCV | Customer | Estimator | PLNAR | Delivery target |
|---|
Below $100,000: 24 hours. At $100,000 and above: 48 hours. Proposed SLA starts upon qualified submission and requires partner validation.
03 / Mix your monthly pipeline
Set the monthly mix by service line. Each uses the selected scope RCV and discount above as an illustrative average.
Exterior volume is scenario planning only, not a current sales forecast.
04 / The unified production flow
Target workflow. Automatic field submission and dispatch are not represented as already live. Mitigation requires evidence of actual work and equipment use, not just visual geometry.
05 / Partner standards
Geometry ownership
Estimator corrects Instant sketch and dimensions as part of the agreed fee.
Native PLNAR integration
Assigned orders, clarification requests, status and ESX/PDF delivery remain in PLNAR's system.
Professional credentials
Xactimate Level 3 expectation; certified-trainer-level leadership.
24h / 48h service levels
Qualified-intake clock, exceptions, revisions and escalations documented.
Production capacity
Backup estimators, continuity and measurable scaling.
Scope discipline
Original errors corrected within fee; genuinely new supplemental scope is a separate order.
06 / Order and pricing rules
Price at submission
Contractor sees a preliminary RCV-based price. No outside portal or manual partner quote.
Customer protection
If completed scope falls in a lower tier, price decreases. If higher, the original quoted fee remains the ceiling.